About Company

SONNEN METAL Company is the application of the best German engineering experience in the design and production of various metal structures.

Since 2017 the Company has been actively promoting its products and services on the markets of Europe and the Middle East.

Based on our extensive experience in the design, installation and maintenance of various metal type structures, we have created solar panel mounting systems that are simple, reliable and competitively priced.

Implementation of quality management system

In 2020 SONNEN METAL has successfully passed the certification audit and received the ISO 9001: 2015 quality certificate, which confirms that the company’s activities are efficient, safe and fully comply with international standards.

Download ISO Certificate (PDF)

Our company is constantly evolving and passing through certification is another step that will allow us to effectively manage risks, increase productivity and efficiency of our activities.

The quality policy of SONNEN METAL LLC (PDF)

Full compliance with standards

SONNEN METAL products meet all modern international and European standards.

We approach each project individually, taking into account the possible loads on the fastening system and the type of soil, as well as needs and wishes of the Customer.

Download TÜV Certificate (PDF)

Mounting systems SONNEN METAL “SM-STV” are certified by TÜV AUSTRIA and meet the requirements of international standards.

Solar Power Plant with a capacity of 1.6 MWp in Plamya, Belarus

SONNEN METAL product:
Ground Solar Panel Mounting System SM – ST4H
Equipment delivery time:
3 weeks
Installed power (DC):
1.6 MWp
Services Delivered:
June 2020

Solar Power Plant with a capacity of 1.6 MWp in Kachanovichi, Belarus

SONNEN METAL product:
Ground Solar Panel Mounting System SM – ST4H
Equipment delivery time:
5 weeks
Installed power (DC):
1.6 MWp
Services Delivered:
May 2020

Solar Power Plant with a capacity of 1.6 MWp in Asmolovichi, Belarus

SONNEN METAL product:
Ground Solar Panel Mounting System SM – ST4H
Equipment delivery time:
5 weeks
Installed power (DC):
1.6 MWp
Services Delivered:
September 2020